Ecosphere | Residential building, Niederlauterstein

'Effizienzhaus 85'

The result is a high-quality, refurbished residential property meeting the KfW 85 standard. Here, low energy consumption goes hand in hand with a comfortable living environment.

Ambitious goals

The residential building in the Saxon town of Marienberg, in the Erzgebirge district, was in a poor state of repair before renovation work began: as a first step, ring beams had to be cast in concrete to increase the load-bearing capacity of the masonry, and timber components had to be replaced or added.

The building, dating from 1948, had originally been constructed with double-shell external walls made of bricks – with a cavity of approximately 10 cm in width between them. Due to these ‘light’ walls, a conventional external thermal insulation composite system (ETICS) made of panel materials was not an option for this property, as it would not have been possible to ensure permanently stable anchoring.

Nevertheless, the aim of the refurbishment was to improve the building’s energy efficiency to such an extent that it meets the requirements for an ‘Efficiency House 85’.

maxit ecosphere external insulation

To achieve the set objective, the first step involved filling the air gap in the external walls with EPS insulation granules. For the additional thermal insulation required on the outside of the walls, maxit ecosphere was chosen.

Due to the conditions on site, the plaster surfaces were levelled using maxit ip 390 lime-trass plaster, and the surface was roughened. After the curing time (1 day per mm of plaster thickness), maxit eco 72 was applied: the spray-applied insulation was applied to a thickness of 10 cm – taking into account the product’s thermal conductivity – to meet the thermal requirements. This was carried out in five stages.

After the appropriate drying time, maxit eco 72 was primed and reinforced. Finally, a fine felt layer was applied using maxit eco 73. The wall surfaces were painted with maxit Solar paint.

Building site:
Marienberg, Niederlauterstein

Fabricator:
Jan Nitzke Construction Company, Marienberg

Architect:
Wohlgemuth Engineering Consultants, Marienberg

Time period
June – August 2025

Surface area:
approx. 190 m2

Products:

  • maxit eco 72 | approx. 3 t (~ 21.600 l)
  • maxit ip 390 (as a weather barrier and bonding agent)
  • maxit prim eco 1170
  • maxit eco 73
  • maxit Reinforcing mesh MW
  • maxit Solar paint

Project location